Overall Solution Of Wind Power Plant

Overview

According to the requirements forwind power generation,CYG SUNRI provides solutionssuch as remote centralized control, integrated automation ofsubstation, powerforecasting, power control, video monitoring, andmicrocomputerinter-locking systemin case of mal-operation,to ensure smooth grid connection of windpower plant,improve safety management and economicbenefits of windpower plant, andreduce theconstruction and investment risks.

(1) Land centralized wind power generation solution: Itcanmeet the comprehensive monitoring, gridconnection and dispatching requirements of windpower plants, and provide comprehensive real-time monitoring of wind turbines, anemometer tower, box transformer,step-up substation, and environmental monitoring system.

(2) Land distributed wind power generation solution: It has achieved the core objective of "unattended, attended with fewer persons and regional maintenance" ofsubstations and plants, avisual monitoring platform withdual structure ofC/S andB/S is provided, and centralized monitoring and management of multipleunattended stations is implemented.

(3) Offshore wind power generation solution:The system can provide remotemonitoring and control of the equipment in theland metering station and the offshorestep-up substation, and achieve various closed-loop control functions according to the requirements of the power grid operation mode.

Application Scenarios

CYG SUNRI provides secondary system overall solutions, including land centralized wind power generation, land distributed wind power generation and offshore wind power generation.

Features

(1) We provideone-stop automaticsolution covering the links of station, central control and grid connection of wind power plant, and our products are advanced, stable and reliable, which can help users save both time and energy;

(2) "Unattended" station isrealized, the system can achieve remote visual operation, comprehensive video information can be provided from multiple perspectives, and the ability to handle accidents and the reliability of operation is improved;

(3) This solution enables the enterprise to realize panoramic operation monitoring, comprehensive statistical analysis, intelligent fault diagnosis, and scientific production management, and in the meantime, it can also meet the requirement of power supply dispatching center operation evaluation and management assessment of power substations;

(4) This solution supportsadvanced data mining and analysis functionsofdraught fan information, and realizeswind speed statistics and trend analysis, power curve analysis, downtime analysis, power generation loss analysis,as well ashorizontal and vertical comparison of various extensions, windpower plants, and various signals.

(5) The system has flexible configuration, the entire wind power plant adopts uniform data collection, processing and interfaces, and various subsystems are integrated seamlessly. This can improve the work efficiency of operators, and promote the corporate management level.

Performance Cases

Copyright © 2021 CYG Sunri Co., Ltd. All Rights Reserved