Xinjiang Mulei 750 kV power transmission and transformation project

The construction of Mulei 750 kV power transmission and transformation project started on August 20, 2019, with a total investment of RMB 560 million. After being put into operation, it will realize 5.6 million kilowatts of new energy consumption, providing strong support for the development of wind power and PV power enterprises and industries in Mulei County, which is of great significance to local economic development; CYG Sunri is the secondary equipment integrator of the substation, and provides monitoring equipment, protection equipment, lightning arrester online monitoring equipment and intelligent terminals for the substation.

Copyright © 2021 CYG Sunri Co., Ltd. All Rights Reserved

link: