China General Nuclear Yingjisha 20MW PV Power Generation 3MW/6MWh Energy Storage Project

The China General Nuclear Yingjisha PV Energy Storage Project was one of the first PV energy storage joint operation pilot projects on generation side in Xinjiang jointly issued by Xinjiang Development and Reform Commission and Xinjiang Regulatory Office of National Energy Administration. Located at China General Nuclear Xinjiang Yingjisha PV Power Station, it was the first PV energy storage project on generation side completed and put into operation in Xinjiang. At present, the total capacity of this PV power station is 20MW, and the total capacity of supporting energy storage power station is 3MW/6MWh. It consists of three 1MW/2MWh energy storage units, and each energy storage unit is composed of the three parts of energy storage battery system, energy storage bidirectional converter and boost system.

As the system integrator of Yingjisha PV Energy Storage Project, CYG SUNRI provided overall solutions of high-quality energy storage system for the project, supplied core equipment independently developed and produced by CYG SUNRI such as the energy management systems and PCS, and provided equipment integration like battery compartments, electrical compartments, transformers and grid connection cabinet.

The "first production" and "first operation" of Yingjisha Energy Storage Project relied on CYG SUNRI's efforts and hard work in the power field for many years, which reflects full-chain delivery capabilities of CYG SUNRI in the primary, secondary and energy storage aspects of power supply, including pre-sale, production and after-sale services. This project only took 45 days from project feasibility study, project approval, finalization of design plan, overall equipment integration, and equipment arrival, which once again refreshed the project delivery speed of CYG SUNRI in the fully integrated energy storage system.

Recommended solutions

Copyright © 2021 CYG Sunri Co., Ltd. All Rights Reserved

link: