PV Leader Project in Yangquan Subsidence Area

As a secondary equipment integrator, Sunri has completed the secondary system integration of two 220kV and eight 110kV booster stations at the same time, providing 401 panel cabinets, more than 1,000 sets of equipment and 27 sets of prefabricated cabins for secondary and communication equipment, effectively saving the construction period and helping the power station to be connected to the grid.